Gate of Europe
The Gate of Europe towers are twin office buildings located in Madrid, Spain. When they were completed in 1996 they were the world’s first inclined high-rise buildings.
American architects Philip Johnson and John Burgee had to come up with a solution to a complex site on one of Madrid’s most important boulevards, the Paseo de la Castellana. A significant setback from the street was required in order to clear a subway interchange.
The resulting structural expressionistic towers are 114 m (374 ft) tall, with an inclination of 15º. They stretch 30 m from their base over the boulevard.
The structural solution involved a 60x10x10 m concrete counterweight located on the opposite side of the inclination under the ground and connected to the top of the tower by cable. This provided the necessary counteraction to the overturning forces.
The building is further strengthened by a primary diagrid of structural steel at the buildings’ perimeters, and a reinforced central core housing the main vertical circulation. Lateral stability is provided by secondary horizontal and vertical structural steel members, expressed architecturally on the facades.
The structure is clad with stainless steel and a dark, reflective curtain wall. The secondary horizontal and vertical members are picked out in red .
The towers are differentiated by the colour of their roof helipads – the west tower’s is blue, the east tower’s is red.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.